Skip to content

How long installation takes

Installation3 min read

The short answer

A straightforward single-room installation usually takes half a day to a full day. Longer or hidden pipe routes, extra rooms, electrical work and difficult access can each add time, sometimes a day or more.

On this page

Time on site depends far more on the route the pipes take than on the size of the unit. Two installations of the same model can differ by most of a day if one has pipes straight through the wall and the other runs them through a loft. The ranges below are typical, and an installer who has surveyed your home can give a firmer estimate.

Typical times

These are for the work itself, from arrival to handover, for wall-mounted systems.

Job Typical time on site What drives it
One indoor unit, outdoor unit directly behind Half a day to a day The simplest layout
One indoor unit further away or upstairs About a day Pipes along or down the outside wall
One indoor unit, pipes hidden indoors One to two days Lofts, cupboards or floors
Two indoor units on one outdoor unit One to two days Length of each pipe route
Three or more indoor units Two to three days or more Pipework and testing for each room

Systems with several indoor units take longer because every room has its own hole, pipe run and drain. How they work is explained in multi-split systems.

Why some steps can't be rushed

A few parts of the job take the time they take, however experienced the engineer.

  • Core drilling. Usually quick through brick, slower through hard stone, concrete or very thick walls.
  • Pressure testing. The pipework is held at pressure with nitrogen long enough to show a leak. Temperature changes move the reading, so a careful engineer lets it settle before judging it.
  • Vacuum. Drawing air and moisture out of the pipes takes longer with long pipe runs and in cold, damp weather.
  • Test running. The system needs to run in cooling and heating long enough to show it's working properly.

If a job is finished much faster than expected, it's reasonable to ask how long the pressure test and vacuum ran for. The full sequence is set out in what happens on installation day.

What can add time

  • Long or complicated pipe routes, especially through lofts, floor voids or fitted cupboards
  • An outdoor unit high on a wall that needs a tower or scaffolding, which may go up on a separate day
  • A base to prepare for a ground stand, such as laying slabs
  • A condensate pump, where water can't drain away by gravity
  • Extra refrigerant for a pipe run longer than the factory charge covers
  • Surprises in the wall, such as an unexpected pipe or cable that means moving a hole
  • Material that might contain asbestos in an older home, which can mean stopping until it has been checked
  • Heavy rain or strong wind, which can pause work outside or at height

The electrical work

Most systems need their own circuit from the consumer unit. The engineer may connect it on the same day if they're qualified to, or a separate electrician may do it, sometimes on another day.

A short, direct cable route from the consumer unit to the system is quick. One that crosses the house, or a consumer unit with no spare space or that needs other work first, takes longer. The detail is in electrical requirements.

Planning around the work

  • Be home at the start to agree positions and at the end for the handover, which includes a walk through the controls.
  • Expect your electricity to be off for a while when the new circuit is connected.
  • Drilling is loud but usually brief. The longer testing stages are quiet, so working from home is usually possible.
  • If a job spans two days, open pipe ends should be sealed overnight to keep out moisture and dirt, and the system can't be used until everything has been tested.

Getting rooms, access and parking ready before the engineers arrive keeps the day on schedule, as explained in preparing your home for installation.

Related guides