Commissioning and handover

Installation3 min read

The short answer

Commissioning is the set of tests that prove a new system is sealed, safe and working as designed. Handover is when the engineer shows you how to use and look after it and gives you the records and certificates to keep.

On this page

Commissioning is where a good installation proves itself. It's also the part most easily skipped, because a system can seem to work perfectly on the day even when a step has been rushed. The records you receive are your evidence that the work was done properly.

What commissioning checks

Some checks happen before the refrigerant is released into the pipes, and others once the system is running. The order they fit into the day is described in what happens on installation day.

Check What it shows
Pressure test with nitrogen The pipework and joints don't leak
Vacuum and hold test Air and moisture are out, and it stays sealed
Refrigerant charge The right amount, including any added
Leak check after the charge Joints are sound with refrigerant in them
Electrical tests The circuit is safe and correctly protected
Test run in cooling and heating The system cools, heats and responds properly
Drain test Water runs away freely

The test run

With everything connected, the engineer runs the system in cooling and heating. Typical checks include:

  • the air leaving the indoor unit is suitably colder or warmer than the air going in
  • the outdoor unit starts, runs smoothly and switches between modes
  • neither unit makes unusual noise or vibration
  • no error codes show on the unit or the controls
  • the louvres, fan speeds, remote control and any app respond properly
  • water poured into the drip tray drains away

Some engineers also compare the system's pressures and temperatures with the manufacturer's figures. Valve caps on the outdoor unit should be refitted and tightened, and the hole through the wall sealed inside and out.

The handover

Before the engineer leaves, you should be shown how to:

  • switch the system on and off, set the temperature and choose a mode
  • use the timers, sleep or quiet settings and any app
  • adjust the fan speed and the direction of the airflow
  • remove, clean and refit the filters
  • find the isolator switch, if one is fitted

A good handover also explains what's normal, so it doesn't worry you later:

  • In heating mode the outdoor unit pauses now and then to defrost, and may give off a cloud of steam.
  • Water dripping from the outdoor unit in heating mode is expected.
  • Soft clicks and a faint sound of flowing refrigerant when the system starts or stops are normal.
  • When heating starts, the indoor fan may wait a few minutes until the coil is warm, so it doesn't blow cold air.

For more on the controls, see the modes explained. Filter cleaning is covered step by step in how to clean the filters.

Records you should get

Document What it shows
Commissioning record Test results, refrigerant type and amount
Electrical Installation Certificate How the new circuit was installed and tested
Building regulations certificate The electrical work complies (England and Wales)
Noise calculation The outdoor unit meets MCS 020(a)
Manuals and warranty details How to use it and what's covered

A useful commissioning record also lists the model and serial numbers of both units, the date, the engineer's name and the installing company's F-gas certificate number. The system itself should carry a label showing the type and amount of refrigerant it contains.

If you applied for planning permission or a Lawful Development Certificate, keep that too. Store everything together: it helps with warranty claims, future servicing and selling your home.

Looking after it from day one

Manufacturers typically recommend regular servicing, often yearly, and some warranties depend on it. Some also need the warranty registering within a set time of installation, so check whether the installer does that or you need to. What a visit involves is set out in what a service involves.

Filters usually need cleaning every few weeks while the system is in regular use.

Before the engineers leave, look over the work. Pipe covers should be fitted and secure, the hole sealed, and the work areas left clean. Point out anything you're unsure about while they're still there to deal with it.