Skip to content

Building regulations

Your home and the rules3 min read

The short answer

The part of the building regulations that most often affects an air conditioning installation is the electrical work. In England and Wales a new circuit is notifiable, so it's done by a registered electrician or notified to building control.

On this page

Planning and building regulations are easy to confuse. Planning is about whether something can go in a particular place, including how it looks and the noise it makes. Building regulations are about whether the work itself is done to set standards, and they apply whether or not planning permission was needed.

Which rules cover which part of the job

An air conditioning installation touches several sets of rules, each dealing with a different part of the work.

Part of the job Rules Who deals with it
Outdoor unit position Planning Local council
New electrical circuit Building regulations Registered electrician or building control
Refrigerant pipework F-gas rules F-gas qualified engineer
Holes through fire-separating walls Building regulations Installer

The planning side is covered in Do you need planning permission? and the refrigerant side in F-gas rules for homeowners. The rest of this guide is about building regulations.

The electrical work

Most air conditioning systems need a dedicated circuit from the consumer unit, rather than a plug in a socket. In England and Wales, adding a new circuit is notifiable work under Part P of the Building Regulations. That means it has to go through one of two routes.

  • A registered electrician. An electrician registered with a competent person scheme can certify their own work. The scheme lets the council know, and you receive a certificate confirming the work complies with the Building Regulations.
  • Building control. If the person doing the work isn't registered, the work has to be notified to the council's building control team before it starts, and building control checks it.

An isolator switch near the outdoor unit is common, so the system can be switched off safely for servicing. Electrical requirements covers circuits and isolators in more detail.

The paperwork you should get

For a new circuit done by a registered electrician, you would normally expect two documents:

  • an electrical installation certificate from the electrician, recording what was installed and the results of their tests
  • a Building Regulations compliance certificate, confirming the work was notified through the scheme

If building control dealt with the work instead, keep whatever confirmation they provide.

Responsibility for meeting the regulations rests with the person doing the work, but if work doesn't comply, the owner of the property can end up having to put it right. Asking before work starts who will certify the electrical work, and how, helps avoid gaps later.

Keep the certificates with the rest of the system's documents. A buyer's solicitor is likely to ask for them if you sell, as covered in Selling a home with air conditioning.

Other parts of the regulations

The electrical work isn't the only thing the regulations can touch, though for a typical wall-mounted system the other areas are usually minor.

  • Fire separation. Some walls and floors are there to slow the spread of fire, such as those between flats, or between a house and a garage built into it. Any hole made through one for pipes or cables has to be sealed properly afterwards.
  • Energy efficiency. The regulations set efficiency standards for fixed heating and cooling systems, including how they're controlled.
  • Larger building work. If an installation is part of a bigger project, such as an extension or a loft conversion, the building regulations for that project apply as well.

A good installer will know which of these apply to a particular installation and can explain how each will be dealt with.

Wales, Scotland and Northern Ireland

Wales has its own version of the Building Regulations. A new circuit is notifiable there too, although other details can differ from England.

Scotland has its own building standards system, and Northern Ireland has its own building regulations. The electrical rules work differently in both, so the local council's building standards or building control team is the place to check what applies.

Related guides